Three Methods of Space Frame Installation

 What are the 3 methods of space frame installation? SAFS steel structure professional technical staff share with customers and friends: 

1. Splicing the entire space frame directly, after the completion of the corresponding ceiling method to hoist the entire space frame into the air, and then within a certain hovering time, weld the space frame in the corresponding position and connect it with the whole building . This method is faster to install, but has higher requirements for operators.


2. The method is relatively mild, the space frame works directly at a high place, and the space frame is installed bit by bit through the part that intersects with the building, that is, starting from the surrounding area and completing the work at the final center point. The schedule is very slow, but the operation difficulty is also reduced a lot.


3. This method is mainly applicable to the quadrangular pyramid structure and the triangular pyramid structure. Each vertebral structure can be completed in advance, and the whole project can be completed quickly by assembling the vertebral structure together with the slider step during installation.


Picture from: https://www.safsteelstructure.com/

Comments

  1. Grazie per aver condiviso con noi queste preziose informazioni. Non vedo l'ora di saperne di piĆ¹ sulle scarpe da basket da uomo a prezzi accessibili. Continua a condividere!
    hangar prefabbricati per aerei

    ReplyDelete

Post a Comment

Popular posts from this blog

In what areas are steel structures usually used

Steel structure engineering reinforcement method