Posts

Showing posts with the label Three Methods of Space Frame Installation

Three Methods of Space Frame Installation

Image
  What are the 3 methods of space frame  installation ? SAFS steel structure professional technical staff share with customers and friends:   1.  Splicing the entire space frame  directly, after the completion  of  the corresponding ceiling method to hoist the entire space frame  into the air, and then within a certain hovering time, weld the space frame  in the corresponding position and connect it with the whole  building . This method is faster  to install, but has higher requirements for operators. 2.  The method is relatively mild, the space  frame works directly at a high place, and the space  frame is installed bit by bit through the part that intersects with the building, that is, starting from the surrounding area and completing the work at the final center point. The schedule  is very slow, but the operation difficulty is also reduced a lot. 3. This method is mainly applicable to the quadrangular pyramid structure and the triangular pyramid structure. Each vertebral structure