The first domestic case of "compensation method" slippage construction of special-shaped sapce frame steel structure roof installation completed
With the completion of the positioning of the steel truss of the last unit, the large-span unequal-length trusses of the main roof of the Suzhou Bay Cultural Center Grand Theater have all slipped into place. It is the first case of "compensation method" sliding construction of the special-shaped sapce frame steel structure roof , which is the "finishing touch" of the Grand Theater. The roof truss for the sliding construction has a total of 9 units, with a total weight of about 350 tons. The overall shape is "C", with a longest span of 41.3 meters and a duration of 48 hours. The project adopts the domestic advanced sliding technology of large-scale sapce frame steel structure. Workers first set up a working platform on the south side of the Grand Theater, hoisted 260 large steel components to the platform, and welded and assembled them into 9 steel trusses. After connecting the auxiliary sliding device, the pulley is installed at the bottom of th...