Matters needing attention when building scaffolding during space frame installation and construction

The space frame structures must be coordinated with the scaffold during the construction process, but because of the safety factors, the scaffold construction regulations are relatively high. I will tell you what you must pay attention to when building the scaffold during the installation and construction of the scaffold.

During the construction of the scaffold, safety hazards must be paid attention to. In addition to the usual removal of the work site and the prohibition of people standing under the scaffold, the following items must be paid attention to in the construction of the scaffold. 


The seamless steel pipe scaffolding built during the construction of the frame engineering must carry out professional design plan calculations, and follow relevant requirements in the work. Construct a special support frame for mobile scaffolding work. The scaffolding column shall be welded to the upper side of the round steel by electric welding. A vertical and horizontal sweeping pole must be installed 200mm away from the round steel surface. If it is a portable scaffold, it must follow the requirements for safe construction deployment on key construction sites when moving. 

The regulations of the frame installation company ensure that the components are placed in the opposite position, and they cannot be piled up and damaged or lost, and ensure that the surface environment of the embedded parts is clean and the center-line position, the specification height and the geometrical specifications must be accurate. In addition, It is necessary to ensure that the horizontal and vertical length error is less than 30mm, the offset of the embedded parts management center is less than 30mm, the nearby embedded parts need to be less than 15mm, and the height difference of the relatively large embedded parts needs to be less than 30mm. 

The portable scaffolding needs to be guided by a full-time staff in every towing situation. After trying to tow for 1-1m, then check whether the iron rack is deformed, and the towing can be declared after it is confirmed that there is no deformation. After the accurate positioning is towed, an inspection of the deformation condition of the scaffold should be carried out. When concrete components such as steel bolt balls and components of the frame are to be hoisted to the scaffolding platform, they must be carried out in batches, and they must be installed and hoisted together. When working, there should not be too many workers on the scaffolding platform, and many people should not stand in one span of the scaffolding, which is very prone to accidents.

 

Comments

Popular posts from this blog

In what areas are steel structures usually used

Three Methods of Space Frame Installation

Space frame has become one of the important fields of modern architectural structure